11/17/2023 0 Comments Download the new Super Warship![]() ![]() Ford (CVN 78) by means of 162 super-lifts, and the Future USS John F. In comparison, crews erected USS Gerald R. And building the aircraft carrier with fewer, but larger, pre-outfitted super-lifts has been a major improvement that contributes to streamlining the construction of CVN 80 over previous Ford-class hulls.”ĬVN 80’s dry-dock erection program, for example, comprises 131 such super-lifts. “Procuring CVN 80 and CVN 81 as part of a two-ship buy has already allowed us to realize efficiencies in the early construction process. Ford-Class New Construction Program Office, offered examples of the ship’s many construction efficiencies. Our industry partners are applying the best practices of Integrated Digital Shipbuilding into the process, and that enables efficiencies, both in terms of cost and schedule.”Ĭapt. Kennedy and applied them directly to constructing Enterprise. ![]() “The shipyard has taken lessons from building USS Gerald R. Downey, program executive officer for aircraft carriers (PEO CV). “This is a significant milestone for the ship and the class,” said Rear Adm. With the first main structural member in place, workers have continued erecting the aircraft carrier in the dry dock by joining together a series of pre-outfitted modules. Work on the Enterprise has been progressing on schedule, since NNS loaded the Enterprise’s keel unit during the ship’s first “super-lift,” on April 5th, 2022. The ceremonial plates will be affixed permanently to the ship’s keel. This section of the ship will support the forward half of the Enterprise, when the CVN 80 is fully assembled. On Saturday, after NNS welders Ephony King and Jonathan Rishor finished welding the athletes’ initials on small, steel plates, NNS Lead Rigger, Mike “Chile” Williams, passed a radio to Ledecky, who gave the command for NNS Crane Operator Charlie Holloway to lower the 688-ton keel unit into the dry-dock. Ford (CVN 78)-class of aircraft carriers. 24, 2017, Biles and Ledecky attended CVN 80’s First Cut of Steel ceremony, marking the initial major construction milestone for the Enterprise-the third ship in the USS Gerald R. Ledecky attended the historic keel laying ceremony for the nation’s most advanced aircraft carrier in person, while Biles participated via a pre-recorded message from the World Champions Center in Spring, Texas. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |